• Skip to primary navigation
  • Skip to content
  • Skip to primary sidebar
  • Skip to footer

Main navigation

  • The Association
    • Our Members
    • Executive Board
    • Projects
      • Member Projects
      • WE Projects
    • Join us!
    • Sponsoring us
  • Small Wind Systems
    • Small Wind Turbines – The Basics
    • The Piggott Turbine
    • Wind Resource Assessment – The Basics
  • Working Groups
    • Delivery Models
    • Education
    • Maintenance
    • Market Assessment
    • Measurement
    • Technology
  • Resources
    • Document Library
    • Videos
    • Webinars
    • Reviews
      • Vendor Reviews
      • Product Reviews
    • Links
  • Contact
  • Forum
  • Login

October 14, 2014 By Leave a Comment

Carapacho – 500 RPM

Location: Carapacho, Malargüe, Argentina
Date of Installation: September 2013

  • Installation of a 700W turbine for a school and funded by the local government.
  • The school is supported by a technical school in a nearbv city and since both received training on maintenance and repair, the support team is large and strong
500 RPM electricity work Piggott turbine
Electricity Work
500 RPM - Painting the tail, Piggott turbine
Painting the tail
500 RPM rotor disc Piggott
Rotor Disc
500 RPM lifting tower Piggott turbine
Lifting the Tower
500 RPM turbine spinning
It’s Spinning

Equipment installed
  • Turbine: 700W Piggott type (locally manufactured)
  • System components:
    – Neo magnets
    – 2 deep-cycle 12Vx150A.h batteries (locally manufactured)
    – 1500W inverter (imported)
    – 60A Morningstar Inverter (imported)
Energy Demand By the school for general purposes: mainly Wi-Fi, computers, phone, projector, lights.
Financing The school receives general financial assistance from the local government, which covers the fuel for the diesel generator, and now covers minor expenses for damaged parts to the wind turbine.
Ownership & Management Community-based: the school teachers and students are in charge of the operation and maintenance. If they cannot solve it on their own, the technical school that built the wind turbine (in a city nearby) can help with these things, for example repairing a damaged blade or making anew one. 500RPM can give remote assistance if needed. So far, the wind turbine has performed well.
Problems & Solutions The main problem was the local logistics: how to take the wind turbine and tower built in the city to the rural area. We had neglected this issue, and we only found a local transport that would do it in the last minute.
Highlights This project was very successful in all of the stages:

  • The wind resource is very good, the need for electricity was very high because they only used the diesel generator for a few hours a day (very restricted by the government who supplied it), so now they have a parallel electricity circuit to feed the computers, phone and router, and they can now use these things almost all the time.
  • The wind turbine was manufactured locally, in a city nearby, together with a technical school that has the infrastructure and previous knowledge required, and also a strong social commitment, so a bond was created between the two institutions (technical and rural), for future collaboration on the maintenance of the wind turbine and other projects. Members of the two institutions carried out the installation, together, and the trainings on the operation and maintenance of the equipment were given to both, so that the “maintenance team” is large and strong.
  • The project was completed on time and the wind turbine is performing very well since the installation.

Video available at https://www.facebook.com/video.php?v=525208244232940&set=vb.155759391177829&type=3&video_source=pages_video_set

To find more about 500 RPM and their projects go to http://windempowerment.org/257/

 

 

Share

Filed Under: Member Projects, Wind Empowerment

Wind Empowerment

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload CAPTCHA.

Primary Sidebar

Recenly Published

  • TUGE Energia

    TUGE Energia

    April 23, 2018
    TUGE Energia is a manufacturer of small wind turbines from Estonia (EU). The company is active since the beginning of 2015, but the development and …Read More »
  • Windmobile

    Windmobile

    April 23, 2018
    The idea of the project was born in April 2005 and pioneered by Mr Guy Putz in his “travail de candidature” (teacher accreditation dissertation), in …Read More »
  • TAREA – Tanzania Renewable Energy Association

    TAREA – Tanzania Renewable Energy Association

    April 23, 2018
    Tanzania Renewable Energy Association (TAREA), a member based non-profit NGO was founded in the year 2000 and officially registered on 7th May 2001 by Tanzania …Read More »

Newsletter

Like us on Facebook

Like us on Facebook

Donate

Tags

500rpm Argentina Blade Design Conference data-logger datalogger delivery models WG design Education WG Ethiopia grid connection INTI Ireland magnets maintenance market assessment Market Assessment WG neuquen nicaragua open-source Patagonia Peru Piggott Piggott Wind Turbines power curve Production projects PureSelfMade Resource Assessment Small Wind Turbines solar summary test site Turbine installer uk v3 power WEAthens2014 webinars wind WindAid Institute wind turbine Wind Turbines WISIONS workshop Workshop teacher

Footer

Blog archive

Donate

Your donation helps us to continue our work!

© 2014 Wind Empowerment · Email: info@windempowerment.org
Wind Empowerment is a Charitable Incorporated Organisation, registered with the charities commission of the UK · Charity number: 1165510